The Union Cabinet chaired by the Prime Minister,
Shri Narendra Modi has approved Phase 2(A) of the Ahmedabad Metro Rail Project.
Under this, a 6.032 km long corridor with five stations (four elevated and one
underground) will be constructed. After the Phase 2(A) operationalization, a
total of 77.63 km of active metro rail network will be established between
Ahmedabad and Gandhinagar.
The five stations under this Phase 2 (A) corridor
are Ashram Road, Koteshwar Ancient Temple, Sabarmati River, Sardar Nagar, and
Airport. The total cost of the project including Interest on Construction
Period (IDC) will be INR 2,169.04-crore.
A new metro corridor of about 6.032 km will be
developed under Phase 2(A) of Ahmedabad Metro Project. This phase aims to
provide seamless connectivity to major areas including residential and commercial
hubs with the existing Ahmedabad-Gandhinagar corridor. Along with this, the possibility
of developing sports facilities in the area in view of the World Police Games
2029 and Commonwealth Games 2030 has also been envisaged.